What we have installed, connected and handed over.
Each project below is work our own crews performed on a live or new plant floor. Filter by the service you need.
TMED-II — plant line installation
Over one hundred machines received, rigged, set, connected and commissioned across the plant's production lines — inside a facility that was already running.
Valve body line — full installation
Complete valve body machining line installed and connected — machines set on line, utilities run to each station and handed over in production.
Converter housing line (IVT) — full installation
Full installation of the 8-speed IVT converter housing machining line — FANUC Robodrill cells and MAKINO machining centres off-loaded, uncrated, rigged into position, set and connected.
Anodizing machine installation — valve body line
Anodizing machine installed for the valve body production line: foundation, supporting steel structure, machine mounting, electrical and HVAC connections, and setup.
SCADA and control panel build
Control panels built, wired and integrated with plant SCADA.
Machine installation
Production machines rigged into position and connected on the plant floor.
Machine utility construction
Electrical and utility installation to the machines, run and terminated inside a working plant.
Plant installation
Installation work carried out inside the plant with our own access equipment.
Have something like this to install?
Send the equipment list, the layout and the date it has to be running. We come back with scope, crew and a schedule.